Passenger Elevator Traction Machine

Passenger Elevator Gearless Traction Machine Product Characteristics Model: WWTY8 Quick Details Traction ratio: 2:1 Rated capacity: 1200,1350KG Rated elevator speed : 0.63,1,1.6,1.75,2.0m/s Max. lifting height:80m Max.shaft load: 6000kg Applicable converter:3 phase 400V Brake voltage: DC200V for...

Send InquiryChat Now
Product Details

Quick Details:

Place of Origin:Zhejiang,China (Mainland)

Brand Name:Safe elevator

Capacity:800KG

Speed:2.0m/s

Color:Blue;yellow

Delivery:7~15 working days

Item:Traction machine


Packaging & Delivery

Packaging Details:Packing in wooden case;standard pack for passenger lift/

elevator gearless traction machine 2.0m/s

Port:Shanghai/Ningbo for passenger lift/elevator gearless traction machine 2.0m/s

Lead Time:In 10 days for passenger lift/elevator gearless traction machine


Model: WWTY8

Traction ratio: 2:1

Rated capacity: 1200,1350KG

Rated elevator speed : 0.63,1,1.6,1.75,2.0m/s

Max. lifting height:80m

Max.shaft load: 6000kg

Applicable converter:3 phase 400V

Brake voltage: DC200V for Brake opening, and DC100V for brake holding

Number of motor poles:32 poles


Model: WYJ250

Traction ratio: 2:1

Rated capacity: 630, 800, 1000, 1250kg

Rated elevator speed : 1, 1.6, 1.75, 2, 2.5, 3.0m/s

Max. lifting height:120m

Max.shaft load: 6500kg

Applicable converter:3 phase 400V

Brake voltage: DC200V for Brake opening, and DC100V for brake holding

Number of motor poles: 24 poles


Model: WTF250

Traction ratio: 1:1,2:1

Rated capacity: 800,1000,1250,1350,1600,2000,2500KG

Rated elevator speed : 1,1.6,1.75,2,2.5,3m/s

Max. lifting height:120m

Max.shaft load: 10000kg

Applicable converter:3 phase 400V

Brake voltage: DC200V for Brake opening, and DC100V for brake holding

Number of motor poles:24poles


1.Packing:To be packed in strong wooden cases, suitable for long distance ocean transportation and well protected against dampness, moisture, shock and rust.  

2.Payment Term:

1)The buyer shall pay 30% as the down payment of the total contract value by T/T to the Seller’ account within 7 days after specification, layout confirmed and contract signed.

2)The buyer shall pay the balance 70% of the total contract value by T/T or L/C to the Seller’ account before shipment. 

3.Lead time: 30 days from the date in receipt of down payment, confirmation of Specification & Layout Drawings.

4.After Service:Mail and hot line 24 hours on line. All the complaints reply in 12 hours. Better solution provide in 24 hours.

 guican factory.jpg

Hot Tags: passenger elevator traction machine, China, manufacturers, suppliers, factory, customized, price
Inquiry
Related Products

Copyright © Safeelevator Co.,Ltd All Rights Reserved.