Glass Home Elevator

Product name: glass home elevator
Item: Home Elevator(MRL)
FOB Price: $9000-$18000
Persons:3-5
Speed: 0.4m/s,1.0m/s
Load: 260kg / 320kg / 400kg
Traction machine: Gearless
Machine Roomless(MRL)
Material: Painted steel, Hairline stainless steel, mirror, etched , Titanium gold, rose gold, golden recess, glass.
Brand Name: SAFEELEVATOR

Send Inquiry
Product Details

Product name :glass home elevator

Item : Home Elevator(MRL)

FOB Price : $9000-$18000

Persons:3-5

Speed: 0.4m/s,1.0m/s

Load:260kg / 320kg / 400kg

Traction machine: Gearless

Machine Roomless(MRL)

Material: Painted steel, Hairline stainless steel, mirror, etched , Titanium gold, rose gold, golden recess, glass.

Brand Name : SAFEELEVATOR

SA-KC052.png

SA-KC052

Ceiling: Mirror, stainless steel frame

Car wall: Stainless steel frame, glass

Controlling box: Integrate controlling box, stainless steel

Floor: PVC floor

SF-BT05.jpg

SF-BT05

Ceiling: LED lamp, stainless steel frame

Car wall: Stainless steel frame, glass

Controlling box: Integrate controlling box, stainless steel

Handrail: Stainless steel round handrail

Floor: PVC floor

S-FH35.jpg

S-FH35

Ceiling: LED lamp, stainless steel frame

Car wall: Stainless steel frame, glass

Controlling box: Integrate controlling box, stainless steel

Handrail: Stainless steel round handrail

Floor: PVC floor


Elevator Knowledge Share

Installation:Emendation of the traction machine

1. Adjust the verticality of the traction machine. Set a plumb line at the inside of the traction sheave, the vertical error between the upper edge and the lower edge of the traction sheave should be within 0.5mm, which can be adjusted by meaning of filling pieces.

2. Suspend a plumb line along the center line of the flange of the traction sheave, and the plumb line should be in superposition with the intersection point between the center line of the flange of the traction sheave and the pitch diameter. Extend the plumb line to the intersection point between the flange center of the double wrap sheave and the pitch diameter, and the relative error should be within 1mm.

3. The relative error between the midlines of traction sheave flange and counterweight sheave flange should be within 1mm.

4. After the position of the traction machine has been adjusted well, fasten all the components. Fix each end of the beams to the 10# channel steel by welding some points whose length is about 20~30 mm , after welding pour concrete into the pre frame hole on one side of the machine beams, pour concrete on the groundwork on the other side to make it height to cover the end part of the machine beams.


Hot Tags: glass home elevator, China, manufacturers, suppliers, factory, customized, price
Related Products
Inquiry

Copyright © Safeelevator Co.,Ltd All Rights Reserved.